site located within a 30-mile radius of New York City CSA’s midtown center, with its $2.2 trillion GDP and its 21.9 million residents
just west of the Hudson River, is strategically located to meet critical supply chain challenges;
and the site also provides less congested routing by road, air, sea and rail to the rest of the US and Canada;
of both the $27.4 trillion US GDP market and the Canadian $2.1 trillion CAD$ GDP, are within 1000 miles of this address;
• Entire property on west side of landmark drive
• Approximately 750' of street frontage on public roadway
• Last Parcel 525-555 LANDMARK DRIVE, CONGERS NY 10920
a unique Clarkstown
(Rockland County) ‘M’ zoned property, with high land-use efficiency;
low-congestion vicinity, with exceptionally safe, low-crime rating;
many essential features already designed, approved, implemented, and included;
it is an industrial development site that is well on its way toward a build-to-suit application
The original 10+ acre subdivision provided for an extension of Landmark Drive, a public (Town) roadway. Of the subdivision’s original six parcels, two have now been sold (one is built out; a second in construction), and the remaining four – the entire west side of Landmark Drive – are now offered for sale as one contiguous parcel group.
The cluster concept empowers the Town’s Planning Board with oversight of the entire subdivision’s review. This enables each parcel owner to develop plans to meet their unique objectives, with the advantage of a wide range of waivers and ‘bulk’ site provisions now already in place for the entire subdivision. This not only facilitates maximum design efficiencies, but improves the efficiency of review times for an individual parcel’s site plans…
Considerable engineering work has been completed, reviewed and approved for the original proposed projects in the subdivision. To the extent that any new project conforms to the subdivision’s prior engineering approvals, parcel owners are that much farther down the road in the approval and permit processes for their ‘build to suit’ applications. This can substantially reduce both process time and associated carrying costs of a project.
The cluster subdivision plan allowed LANDMARK to configure site plans in ways that can achieve effective net floor areas of up to a ratio of about 70% of the available land area. This compares to an analysis of many recent industrial development projects in the NYC metropolitan area where approved useable floor area of industrial parcels have generally been between 30% to 50% of a parcel’s net land area, - largely due to those sites’ lot irregularities, required setbacks, wetland restrictions, interior drive lanes, stormwater basins, buffers, and similar property features that constrain more effective land use. For LANDMARK, the higher land use ratio not only improves investment return, but reduces ongoing maintenance costs of areas unavailable for development.
Designed, approved, constructed, and included... In order to enable construction of the first parcel in the Park, numerous infrastructure components were designed, approved and implemented, that now are in place and available for all future developments in the Park. More on this to follow…
Legal Notice This website collects minimal personal data, such as name and email address, when voluntarily submitted through contact or download forms. This information is used solely for communication related to Landmark Corporate Park and is not shared with third parties. By using this site, you agree to this privacy practice and to use this website for informational purposes only. All content, including text, images, and downloads, is the property of Landmark Corporate Park and may not be reused without written permission. We reserve the right to update or modify this website or its contents at any time without prior notice.
Credits: Icons by various authors from Flaticon | Map data ©2024 Google – Image ©2024 Maxar Technologies | Design by Diagre Studio
Copyright © 2025 Landmark NY - All Rights Reserved